Tie anchors for the new motorway bridge over the Danube
PROJECT
CLIENT:
ARGE A 26 Linzer Autobahn
PRINCIPAL:
ARGE A 26 Linzer Autobahn
LOCATION:
Linz (Austria)
AMOUNT:
2.921.803,87 €
PERIOD OF EXECUTION:
2019-2021
PROJECT DESCRIPTION:
Creation of 12-core tie rods of 60-80 metres in length, with a total of approximately 11400 metres of drilling. The holes were drilled with a maximum deviation of 1%